November 25, 2016
Bulletin interne de l'Institut Pasteur
The Technical Department's building workshop center would like to inform you that annual generator tests will be held throughout the campus.
The tests are scheduled throughout 2017 and concern 12 buildings:
The tests guarantee the safety of the electric systems and networks throughout the campus.
The tests will begin at 7.30am and end at 9am. Power outages lasting just a few seconds are to be expected at the start of each test.
View the test schedule for each building concerned and find out the different equipment affected